21 May 2010

COMIT Case Study 16: 4hsolutions and Magnor plant

Author: COMIT
Document type: Case Study
Published: 21 May 2010

As part of the Morgan Est group, Magnor Plant is responsible for carrying out a thorough examination of every piece of equipment across all of the group’s construction sites on a rolling six-monthly basis. They needed a way to reduce paperwork. Post-inspection administration and time spent re-keying data was getting out of hand: inputting up to 30 pages of results could take three or four days to complete, which then meant a delay of up to two weeks getting the final inspection report back to site.

Download 4hsolutions and Magnor Plant Case Study