COMIT Case Study 16: 4hsolutions and Magnor plant
- Author: COMIT
- Document type: Case Study
- Published: 21 May 2010
As part of the Morgan Est group, Magnor Plant is responsible for carrying out a thorough examination of every piece of equipment across all of the groups construction sites on a rolling six-monthly basis. They needed a way to reduce paperwork. Post-inspection administration and time spent re-keying data was getting out of hand: inputting up to 30 pages of results could take three or four days to complete, which then meant a delay of up to two weeks getting the final inspection report back to site.